Posts

Showing posts with the label TBMs

Mumbai Metro | MMRC places an order for 17 new Tunnel Boring Machines

Mumbai: Amid controversies and oppositions, Mumbai Metro Rail Corporation (MMRC) completed the stacking and excavation work for the Metro-3 corridor (Colaba-Bandra-SEEPZ) this year, and tunnel work began in early November. At the beginning of the year, the MMRC placed an order for 17 tunnel boring machines (TBM) to carry out the corridor tunnel work. Of these, five have arrived in the city. The first tunnel boring machine was lowered at the Naya Nagar launch pit in Mahim in September. It took him almost 45 days to assemble the entire machine, which was lowered in three separate parts. According to the MMRC, this TBM has completed 50 meters. The machine is expected to leave Dadar in September 2018. The machines have also been downloaded at Vidya Nagari in Kalina, Azad Maidan near Chhatrapati Shivaji Terminus and Pali Ground in Marol Naka. The tunneling work is carried out 25 meters below the surface of the earth, and the machine can cover a distance of approximately 12 meters per day....