Posts

Showing posts with the label Garia-Airport Metro link

Kolkata Metro | Two towers to be sliced for Garia-Airport Metro link

Image
New Town: Two residential towers in Mahisbathan of the New Town that stand in the way of the new Garia-Airport Metro link will have a small part, rail officials said Tuesday. Officials at Rail Vikas Nigam Ltd, the 32km project implementation agency, said they would soon hire a consultant and an architecture firm to suggest how to cut a 3.2m-wide section of two Ramdhanu Apartment towers from the front. The third tower in the urbanization will remain intact. “The Ramdhanu complex is located between two proposed pillars of the viaduct in which the new Garia Airport link roads will be laid in. Unlike four other buildings in the vicinity, the residential towers do not need to be completely demolished. front of the two towers will infringe the viaduct, “said a railway official. “A survey has indicated a 1.2 m violation, a safety clearance of 2 m must be taken into account, which means that a total of 3.2 m must be cut.” This is the first engineering challenge facing an...

Kolkata Metro | Two towers to be sliced for Garia-Airport Metro link

Image
New Town: Two residential towers in Mahisbathan of the New Town that stand in the way of the new Garia-Airport Metro link will have a small part, rail officials said Tuesday. Officials at Rail Vikas Nigam Ltd, the 32km project implementation agency, said they would soon hire a consultant and an architecture firm to suggest how to cut a 3.2m-wide section of two Ramdhanu Apartment towers from the front. The third tower in the urbanization will remain intact. “The Ramdhanu complex is located between two proposed pillars of the viaduct in which the new Garia Airport link roads will be laid in. Unlike four other buildings in the vicinity, the residential towers do not need to be completely demolished. front of the two towers will infringe the viaduct, “said a railway official. “A survey has indicated a 1.2 m violation, a safety clearance of 2 m must be taken into account, which means that a total of 3.2 m must be cut.” This is the first engineering challenge facing an...