Posts

Showing posts with the label DBL

Bhopal/ Indore Metro | MPMRCL gave Letter of acceptance (LoA) to Dilip Buildicon (DBL)

Madhya Pradesh: "The Madhya Pradesh Metro Rail Co. Ltd, Urban Administration, and Development Department, Bhopal (MP) gave a letter of acceptance (LoA) to Dilip Buildicon (DBL) for Bhopal and Indore Metro Rail project, phase-I, valued at Rs 247.06 crore and Rs 228.96 crore, respectively." Friday said it has won orders worth Rs 476.02 crore for Bhopal and Indore Metro Rail project, highways builder Dilip Buildicon (DBL). The sources said that DBL has received a letter of acceptance (LoA) for Bhopal and Indore Metro Rail project, phase-I, valued at Rs 247.06 crore and Rs 228.96 crore, respectively, by the Madhya Pradesh Metro Rail Co. Ltd, Urban Administration, and Development Department, Bhopal (MP). About Bhopal Metro:  Bhopal Metro project is based on  Rapid Transit Light Metro (RTLM)  system. The Bhopal city has become one of the education hubs for technical students Bhopal Metro will be wonderful transport facility for them and other city dwellers. The total len...

Bhopal Metro | DBL gets L-1 bidder for Bhopal Metro rail project, phase-I

Bhopal: On Tuesday Highway developer Dilip Building (DBL) pushed ahead that DBL has been selected as the lowest bidder for phase-I of Bhopal Metro rail project , it has bagged a Metro rail project with project cost  Rs 247.06 crore in Madhya Pradesh. Dilip Buildcon said that the company has been declared L-1 bidder for Bhopal Metro rail project, Phase -I, valued at Rs 247.06 crore by the Urban Administration and Development Department Madhya Pradesh Metro Rail Co Ltd (MPRCL), Bhopal, in a BSE filing. The project which includes construction of design and construction of elevated viaduct between AIIMS and Subhash Nagar (excluding stations) which includes entry and exit to the depot for Bhopal Metro Rail project, phase-l. The project also consists design and construction of elevated viaduct whose length is of 6.2 km between AIIMS and Subhash Nagar, which does not exclude stations, entry, and exit. The completion period for the project is 27 months. The brokerage house said that...