Posts

Showing posts with the label Delhi-Meerut RRTS

RRTS | Delhi Government rejects Delhi-Meerut RRTS corridor

New Delhi: The Delhi Government has rejected the Delhi- Meerut  RRTS corridor,   National Capital Region Transport Corporation"s (NCRTC) proposal to build an elevated station at Sarai Kale Khan. The Delhi-Meerut Regional Rapid Transit System (RRTS) aims to reduce travel time between the two cities to just 55 minutes. The construction of the station would delay the redevelopment project of the existing Sarai Kale Khan inter-state bus terminal (ISBT) by more than two years. The Sarai Kale Khan station was supposed to be the starting point of the RRTS line from Delhi. However, State Transport Minister Kailash Gahlot returned the file on September 12 saying that the government would approve the station only if it"s according to the previous plan in which the station was designed to be underground, said Delhi government.   While changing the station"s design, the Delhi government was not kept in loop by the NCRTC. At least 11 approvals including DDA, ASI, Delhi Urban A...

Centre asks Delhi govt to avail loan for Rapid Rail: Puri

New Delhi:  Union Housing & Urban affairs minister Hardeep Singh Puri communicates to Delhi government that it cannot bear Delhi’s share for rapid rail project.  The propose project is between Sarai Kale Khan and Meerut. This comes after chief minister Arvind Kejriwal requesting center to fund the project. Puri has instead written to Kejriwal with a suggestion that Delhi government can get loan for the raid rail. As per close sources, Puri has made it clear that there is a template for all mass transit projects. The template clearly states the shares of equity that the Centre and state have put to. The urban minister asserted that they will not change the said arrangement. Previously, Puri had communicated to Delhi government that his ministry can help them avail loan at economical rate of interest. As per current data, Delhi government requires to pitch in Rs 1,138 crore as equity for the Rs 31,902 crore project. Urban affairs secretary Durga Shankar Mishra during ...

NCRTC invites bid for detailed geo-technical investigation work for Delhi-Meerut RRTS

Image
New Delhi: The National Capital Region Transport Corporation Ltd. (NCRTC) inviting tender for detailed Geotechnical investigation work from Modi Nagar North to Shatabdi Nagar of Delhi-Meerut Regional Rapid Transit System Corridor. Key points of tender notice: Tender Notice No.: DM/G/01 Schedule of work: Detailed Geotechnical investigation work from Modi Nagar North to Shatabdi Nagar from 49.10 km to 64.10 km of Delhi-Meerut Regional Rapid Transit System Corridor. Approximate cost of package:  INR 73.51 Lakh Earnest money deposit (EMD): 1.47 Lakh Period of completion: 180 days (6 months) Availability of Bidding documents: The bid documents will be available for downloading from 20/07/2018 (0930 hrs.) to 17/08/2018 (up to 1100 hrs.) on the website https://eprocure.gov.in (a link for the same is provided on NCRTC’s website www.ncrtc.in) Tender document cost: Nil (Free of Cost) Seeking Clarification: ...

Meerut Metro | RRTS project trumps metro rail project of city, no work on metro project

Meerut: While the process of Rapid Rail is accelerating these days, the Meerut Metro rail project is currently making dust in the files. Meerut Development Authority is arranging Rs 10 crore for contributing on the instructions of Commissioner Prabhat Kumar for Rapid Rail. National Capital Region Transport Corporation (NCRTC) has asked the Authority to provide funds for the earliest while the Meerut Metro is waiting for the central government’s approval. MDA Vice President Sahab Singh said that MDA to contribute Rs 10 for Rapid Rail, as initial fund and the will be paid soon. At present, the revised DPR of Meerut Metro i.e. pending before the Central Government for approval, after approval from the UP Cabinet. The work on Central government’s ambitious Delhi-Meerut Rapid Rail Project is going very fast. The centre is ready to fund Rs. 32,000 crore for this rapid rail project. Recently, tender of civil work has also been opened for construction of 4 stations between Duhai fro...

Meerut Metro | RRTS project trumps metro rail project of city, no work on metro project

Meerut: While the process of Rapid Rail is accelerating these days, the Meerut Metro rail project is currently making dust in the files. Meerut Development Authority is arranging Rs 10 crore for contributing on the instructions of Commissioner Prabhat Kumar for Rapid Rail. National Capital Region Transport Corporation (NCRTC) has asked the Authority to provide funds for the earliest while the Meerut Metro is waiting for the central government’s approval. MDA Vice President Sahab Singh said that MDA to contribute Rs 10 for Rapid Rail, as initial fund and the will be paid soon. At present, the revised DPR of Meerut Metro i.e. pending before the Central Government for approval, after approval from the UP Cabinet. The work on Central government’s ambitious Delhi-Meerut Rapid Rail Project is going very fast. The centre is ready to fund Rs. 32,000 crore for this rapid rail project. Recently, tender of civil work has also been opened for construction of 4 stations between Duhai fro...

NCRTC invites bids for engagement of detailed design consultant for elevated RRTS stations

Image
New Delhi: The National Capital Region Transport Corporation (NCRTC) issued tender notice for Engagement of detailed design consultant for detailed designs and drawings of 4 nos. of elevated RRTS stations in the section from Sahibabad ramp to EPE Crossing and maintenance depots at Duhai and Modipuram for Delhi-Meerut RRTS Corridor. DM-09-DDC Engagement of detailed design consultant for detailed designs and drawings of 4 nos. of elevated RRTS stations in the section from Sahibabad ramp to EPE Crossing and maintenance depots at Duhai and Modipuram for Delhi-Meerut RRTS Corridor. Tender documents can be purchased from 19.03.2018 (1000 hrs) to 04.05.2018 (1100 hrs). Region Rapid Rail System Project in India Tender documents can be submitted from 27.04.2018 (1000 hrs) to 04.05.2018 (1100 hrs). Tender document will be opened on 04.05.2018 at 1130 hrs. For more details, please write to editor@metrorailnews.in Click here to see on portal https://is.gd/IEFFgP

NCRTC invites bids for engagement of detailed design consultant for elevated RRTS stations

Image
New Delhi: The National Capital Region Transport Corporation (NCRTC) issued tender notice for Engagement of detailed design consultant for detailed designs and drawings of 4 nos. of elevated RRTS stations in the section from Sahibabad ramp to EPE Crossing and maintenance depots at Duhai and Modipuram for Delhi-Meerut RRTS Corridor. DM-09-DDC Engagement of detailed design consultant for detailed designs and drawings of 4 nos. of elevated RRTS stations in the section from Sahibabad ramp to EPE Crossing and maintenance depots at Duhai and Modipuram for Delhi-Meerut RRTS Corridor. Tender documents can be purchased from 19.03.2018 (1000 hrs) to 04.05.2018 (1100 hrs). Region Rapid Rail System Project in India Tender documents can be submitted from 27.04.2018 (1000 hrs) to 04.05.2018 (1100 hrs). Tender document will be opened on 04.05.2018 at 1130 hrs. For more details, please write to editor@metrorailnews.in Click here to see on portal https://is.gd/IEFFgP