Bangalore Metro | BMRC invites tenders for constructions between Silk Board and Bellandur
Bengaluru: The Bangalore Metro Rail Corporation Limited (BMRCL) on Tuesday notified tenders to build the KR Puram-Silk Board (Outer Ring Road) line . Recently, the state cabinet approves funding for this 17-km fully elevated Metro line . The tender has been released as three packages, each one consisting of viaduct (the series of arches on which rail tracks are laid) and station work. Package 1 has called for constructions between Silk Board and Bellandur (four Metro stations) running to a length of over 7 km at a cost of Rs.427.29 crore. The deadline to submit bids is 13th April 2018. “Construction of Elevated Structures (Viaduct &Stations) of length 7.086 Km (approx.) from Silk Board(ORR) to Bellandur Station(excluding) (Chainage 0.00m to 7086.00 m) including road widening & allied works and 4 Numbers of Metro Stations viz, Silk Board(ORR), HSR Layout (ORR), Agara lake, Ibbalur in ORR line of Bangalore Metro Rail Project, Phase-2A.” Package 2 calls f...