Posts

Showing posts with the label BMRC tenders

BMRCL to give ORR metro contracts only after studying bid capacity

Bengaluru: Contracts for laying down the 18-km Metro line on the outer ring road (ORR) to be given after assessing financial capacity. The Bengaluru Metro Rail Corporation (BMRCL) has stated that contracts to be given to the lowest bidder based on financial competence. This come after several media reports hinting that the contracts are split but work going to same bidder. There were question raised in terms of transparency in allocating contracts based on bidding value. It was earlier reported that the ORR work is split into three packages to speed up work. Though financial bids for the project are yet to be opened by BMRCL, but several sources hinted that one company has quoted lowest bid in all the three packages. This raised doubts and questioned the mode of operation of BMRCL for ORR Metro work. Managing director of BMRCL, Ajay Seth clarified that all the three packages have a number of technical capacity criterion that includes “bid capacity” and “liquidity...

Bangalore Metro | Tender floated for Vellara to Shivajinagar stretch

Bangalore: Bangalore Metro Rail Corporation Limited (BMRCL) has invited tender for the first phase of the Vellara Junction to Shivajinagar project. This comes in wake of the BMRCL approaching European Investment Bank (EIB) seeking a green signal to float a tender for the tunnel network from Vellara to Pottery Town. The cost of the project is estimated at around ₹1,130.61 crore. The tender is invited for interested parties for the design and construction of underground structures covering a of 2.755 km at Vellara, M.G. Road and Shivajinagar in the Reach-6 line in Phase 2 of the metro rail project. As per the recent development, the tender will be floated in two packages in order to make bidding competitive and fair. The project is expected to completed in around three-and-a-half years. Mahendra Jain, MD, BMRCL shared that the tender for the second package will be invited soon. In both the packages the official shared that they will be employing five tunnel boring machines. Jain s...