Delhi Metro | DMRC starts test runs on Pink Line between I.P. Extension and Maujpur
New Delhi: The Delhi Metro Rail Corporation (DMRC) today started test runs on the 10.47 kms stretch between the I.P. Extension and Maujpur elevated section of the upcoming 59 kms long Majlis Park – Shiv Vihar corridor (Line 7) of Phase-III, also known as the Pink Line. The Test Runs were flagged off by DMRC Chief Mangu Singh. According to press release, during these test runs, the interface of the Metro train will be checked to ensure that there is no physical infringement with civil infrastructure during the movement of the train on the track and also testing of various subsystems of coaches shall be done. The new signaling technology known as Communication Based Train Control (CBTC) will be implemented on this corridor and will undergo rigorous testing in stages. The response of the train at different speeds, braking of the train and the interconnection with the Operations Control Centre (OCC) will also be monitored during the trials. The behavior of the track system and the Ov...